Case Study

Problem: A hospital is experiencing frequent power outages, and the existing backup power system is not providing reliable power during outages.

 

Solution: The electrical engineer conducted a review of the existing backup power system and identified that it was outdated and not sufficient to meet the hospital’s power needs.

 

The engineer designed and implemented an upgrade to the backup power system, including the installation of new generators, transfer switches, and uninterruptible power supplies. The engineer also provided training to the maintenance team on how to properly maintain the new backup power system.

The form has been successfully submitted

The message was not sent!